SPEED-WASTE-LIFTER
The way to maximize your performance
Villiger's SPEED-WASTE-LIFTER revolutionize the emptying process with garbage trucks. With the partially and fully automated crane arm, above, half and underfloor collection containers can be emptied within a few seconds. The SPEED-WASTE-LIFTER vertically elevates the bins so that they cannot be misjudged. Frontal emptying also offers advantages, increasing the load capacity of the crane and reducing the danger zone.
With the SPEED-WASTE-LIFTER, efficiency, economy & sustainability are increased enormously.
Product information
- Semi or fully automatic handling
- 340° rotation
- Vertical pivoting
- Front side emptying
- High load capacity
- Parking position on both sides
- Time and cost saving
- Reduction of carbon emissions
Model types
- SWL 95-5 arm length 4.5 m
- SWL 105-7 arm length 7 m
- SWL 105-9 arm length 9 m
Emptying system
- Mushroom, 1 hook, 2 hooks, 3 hooks